HN-ATS series 10KV metering CT Automatic Testing System
Function & Feature
■ Meet the National Standard of JJG 1021-2007、GB 1208-2006、GB 1207-2006. Achieve the automatic test of 10Kv metering CT and PT.
■ Achieve the automatic loaded and unloaded, transferring, wiring, testing of the transformers.
■ Connection with control platform of master control room, interchanging live time information of the System and tested transformer.
■ Transformer can be loaded and unloaded with the Multi Degree of Freedom robot.
■ Displaying the system operating status, with the sophisticate design of systems exceptions identification and warning protection to insure the safety and reliability of system operation.
■ Fully satisfy the request of manually、single or multiple auto-control.
■ With the high space utilization, can be fitted into small space and easy for device extension
■ Modularization design, easy installation and maintain.
■ Multiple function, easy to use, practical、advanced、economics and safety.
■ Mature technology, pay attention on efficacy and well-formed.
■ Parallel running of Detection station and mutually independence lead to a high working efficiency.
■ Comprehensive automation, intelligence, low error rate and easy maintain.
■ Outstanding withstand-voltage design: massive use of insulation material in the mechanical structure to meet the withstand-voltage requirement.
■ Innovative design of withstand-voltage module can perform the all-insulated and semi-insulted withstand-voltage test.
■ Patented technology of primary secondary connection is the first of its kind in China.
■ Independent positioning mechanism, simple structure, high positioning accuracy, easy to install or uninstall, suitable for different size of high voltage transformer.
■ Entrance guard system, ensuring safety during the process of high voltage measurement.
■ Breakpoints switch sets on the conveyor line, ensuring safety of the high voltage measurement.
Application
■ Testing and verification of 10kv metering CT & PT. The testing and verification factors include: appearance, insulation, withstand voltage, voltage error, current error, etc.
■ Suitable for power grid companies measurement test center
Specification
Condition of use |
Environment of use |
Temperature |
0℃~40℃ |
Relative humidity |
20%-75% |
||
Altitude |
<4000m |
||
The use of power |
Voltage |
380VAC±5% |
|
Frequency |
50HZ±0.5HZ |
||
Voltage error |
±0.1% |
||
Parameter |
Transformer type for calibration |
10kv metering CT & PT |
|
Calibration rate |
30000pieces per day |
||
Calibration position
|
Appearance inspection position |
1 Position |
|
Insulation inspection position |
1 Position |
||
Withstand voltage inspection position |
1 Position |
||
Current error calibration position |
1 Position |
||
Voltage error calibration position |
1Position |
||
Loading or unloading robot |
Basic function |
Loading or unloading |
|
Repeated positioning accuracy |
±1mm |
||
Time of loading and unloading for one transformer |
20s |
||
Transmit line
|
Max speed |
12m/min |
|
Average noise |
<60db |
||
Positioning error |
±1mm |
||
Human-computer interface |
Interface switching response time |
≤500ms |
|
Data refresh time |
≤800ms |
||
Verification data backup, storage, operation maintenance log online storage cycle |
≥6 Months |
||
Dimension (L×W×H) |
Standard module:17 m×7 m×3m |